Operation

Three steps. Under thirty seconds.

The PT 25 is mechanically driven and operated by a single control rope from the forklift cabin. No PLC programming, no operator training overhead.

01

Position the pallets

Place the loaded pallet on one side of the PT 25 and the empty target pallet on the other side. Both pallets sit on the integrated guide rails.

02

Pull the control rope

From the forklift cabin, pull the rope. The PT 25's hydraulic mechanism lifts the load, retracts the source pallet, and lowers the load onto the target pallet — automatically.

03

Drive away

The transfer completes in under 30 seconds. Pick up the new pallet with the forklift and continue. No operator dismount, no manual restacking.

Want to see it in your facility?

Request a video demonstration or a site visit from our engineering team.

Contact us